Phase 6 — Deployment

Overview

The Deployment phase moves tested, approved software from the staging environment to production. A well-executed deployment is planned, automated, monitored, and reversible.

Modern deployments are not single big-bang events. They use progressive delivery techniques — feature flags, canary releases, blue/green deployments — to minimise risk and enable rapid rollback.


Goals

  • Deploy software to production with zero or minimal downtime
  • Verify the deployment is healthy through monitoring and inflight testing
  • Have a clear roll-backward plan ready if issues are detected
  • Communicate deployment status to all stakeholders

Entry Criteria

  • All quality gates passed (see Testing phase)
  • Test Summary Report approved
  • Change Advisory Board (CAB) approval obtained (if applicable)
  • Deployment runbook reviewed by on-call engineer
  • Rollback procedure documented and tested
  • Release notes prepared

Deployment Strategies

Blue/Green Deployment

Two identical environments — blue (current live) and green (new version). Traffic is switched atomically from blue to green.

Traffic Router
├── BLUE ← 100% live traffic (current version)
└── GREEN ← 0% traffic (new version, ready to go live)

After deployment:
├── BLUE ← 0% traffic (kept warm for rollback)
└── GREEN ← 100% live traffic (new version)

Pros: Instant rollback, zero downtime
Cons: Requires double infrastructure

Canary Deployment

Gradually shift traffic to the new version while monitoring metrics.

Stage 1:  5% canary → new version | 95% → old version
Stage 2: 25% canary → new version | 75% → old version
Stage 3: 50% canary → new version | 50% → old version
Stage 4: 100% → new version (old version decommissioned)

Pros: Gradual risk exposure, real-world validation
Cons: Complex traffic management, longer total deployment

Rolling Update (Kubernetes)

Kubernetes replaces pods one at a time, keeping the service available throughout.

strategy:
type: RollingUpdate
rollingUpdate:
maxSurge: 1 # Allow 1 extra pod during rollout
maxUnavailable: 0 # Never reduce below desired replica count

Deployment Runbook Template

Every deployment must have a runbook:

## Release: v1.2.0
**Date:** 2024-03-15 22:00 UTC
**Engineer:** @deployer
**Rollback Owner:** @oncall-engineer

### Pre-Deployment Checks
- [ ] All feature flags configured for canary stage
- [ ] Database migrations tested on staging
- [ ] Rollback procedure reviewed

### Deployment Steps
1. Tag release: `git tag -a v1.2.0 -m "Release 1.2.0"`
2. Trigger CD pipeline: [link to pipeline]
3. Monitor deployment progress in ArgoCD/Spinnaker
4. Verify health checks at 5%, 25%, 50%, 100% traffic
5. Run smoke tests post-deployment

### Post-Deployment Verification
- [ ] Inflight test suite green
- [ ] Error rate < 0.1% in Grafana dashboard
- [ ] Latency p99 < 500ms
- [ ] No unusual spike in logs (Kibana/DataDog)

### Rollback Trigger Criteria
Roll back immediately if any of the following occur:
- Error rate > 1% within 10 minutes
- p99 latency > 2x baseline
- Any P1 defect reported

Post-Deployment Monitoring

Key signals to watch for 30–60 minutes after deployment:

SignalToolThreshold
HTTP error rate (5xx)Grafana / Datadog< 0.1%
API latency p99Grafana / Prometheus< baseline × 1.5
JVM heap usageMicrometer + Grafana< 80%
Database connection poolHikariCP metrics< 90% utilisation
Kafka consumer lagKafka UI / Grafana< 5 minutes behind
Exception countELK / DatadogNo new exception classes


Exit Criteria

  • Deployment completed successfully
  • All health checks passing
  • Inflight tests green
  • Monitoring dashboards are normal for 30+ minutes
  • Stakeholders notified of successful deployment
  • Old version decommissioned (blue environment cleaned up)